References

Home References
LİMAK HOLDİNG

Kargı Stream LV-MV Works Electrical Shaft and Lighting Systems Hydro Electric Power Plant Installation

Kırıkkale Belediyesi

Electrical Strong and Weak Installation works of the Nikah Hall Facility

TURK YAPI

Various Factory Facilities Electrical Infrastructure Works and Grounding Systems Construction Works

Trabzon Havalimanı

Airport International Lines Electrical Works

SEMİH OFSET MATBAA TESİSLERİ

630 KVA High Current Panel manufacturing, distribution and expansion works and printing machines assembly work

SAFAŞ SAF PLASTİK SAN ve TİC A.Ş

17000 m2 closed area (h=18 MT) Electrical Power and Weak Current facilities complete including 630 KVA Transformer

İŞ BANKASI FİNANSAL KİRALAMA A.Ş

Safas Saf Plastik San. And Tic. A.Ş. Factory with Transformer - Generator - Inverter group system and 630 KVA Transformer Installation and assembly work

ALACALI İNŞAAT SAN. TİC. A.Ş

9850 m2 (h=13 MT) Prefabricated building elements Factory Electrical Strong and Weak Current Installation works

TÜRK TRAKTÖR ve ZİRAAT MAKİNALARI A.Ş

Strong and Weak Current installation in-plant revision works and EXPROOF installation assembly works 400 KVA transformer plant maintenance works

TURANLAR MAKİNA SAN. VE TİC. A.Ş

Medium Voltage Energy Transmission Line Renovation Works

LAZZONİ MOBİLYA İNŞ. TURZ. SAN. VE TİC. LTD. ŞTİ

400 KVA Pole Mounted Transformer and Energy Transmission Poles construction work

DESOS DİZAYN DEK. MOB. İNŞAAT SAN. VE TİC. LTD. ŞTİ

4200 m2 closed area (h = 11 MT) Factory Facility Electrical Strong and Weak Current Installation installation and 400 KVA Transformer installation works

TÜRKSEVEN TURİZM İNŞAAT VE TİC. A.Ş

9603 m2 Closed area (h=11 MT) Factory Electrical Strong and Weak Installation works

NURİŞ PREFABRİK YAPI İNŞAAT SAN VE TİC. LTD. ŞTİ

6900 m2 closed area (h=12 MT) Factory Electrical Strong and Weak facility and 630 KVA Transformer installation and assembly works

MEKA MÜHENDİSLİK İNŞAAT SAN. VE TİC.LTD. ŞTİ

8500 m2 closed area (h=13 MT) Factory Electrical Strong current installation works

IŞIK İSKELE

Factory Facility Strong and Weak Installation works

HARDAM FOR GENERAL COMPANY

Polyclinic Building Electrical Strong and Weak Current Installation construction and installation works

ÇETİN MEDYA GRUP TESİSLERİ

4700 m2 closed area General Directorate and N Printing House and Provincial Newspaper printing place Electrical Strong and Weak Current installation works

ALŞİN ÇELİK

Factory Facility Grounding System and Administrative Building Electrical Strong and Weak Installation works

TC PTT ANKARA OĞULBEY DEPO BİNASI

Electrical Installation Strong and Weak Current Facility construction and installation works

DÖRTDİVAN ÇERÇEVE VE MACUN SAN. TİC. LTD. ŞTİ

9000 m2 Closed Area (h= 12 Mt.) Electrical Installation Strong and Weak Current Installation works

DİKTAŞ SOĞUTMA A.Ş

Factory Electrical Strong and Weak Installation works

ILGAZ İNŞAAT A.Ş

Electrical High Current Installation installation works

SAĞLIK BAKANLIĞI GÖKÇEADA EĞİTİM VE DİNLENME TESİSLERİ

Renovation of Power and Capacitor Panels and facility repair works

UZAY FORM LTD. ŞTİ

3592 m2 closed area (h=10 MT) Factory facility Electrical Strong and Weak installation works and 250 KVA Transformer installation works

ANKARA F TİPİ CEZA EVİ

Digital Paging Systems

BOLU F TİPİ CEZA EVİ

Digital Paging Systems

TEKİRDAĞ F TİPİ CEZA EVİ

Digital Paging Systems

EDİRNE F TİPİ CEZA EVİ

Digital Paging Systems

İZMİR F TİPİ CEZA EVİ

Digital Paging Systems

AKPA ALÜMİNYUM

Industrial Plant

LİMAK HOLDİNG

HEPP Construction

KAM ANKARA BETON SANAYİ A.Ş

Additional Factory Electrical Strong and Weak works and project drawing

Footer Background